Results Of Shiming Up Rear Base
Posted: Tue Apr 20, 2010 7:05 am
Results of adding a four thousandths thick shim made from an alumnium drink can under the the rear Weaver base on my Anschutz 1416 were;
40 meter point of impact up 1.9".
Lowered elevation adjustment on the Leupold 12X 4.5 minutes (18 clicks) to zero chicken setting @ 40 meters.
40 meter group @ 1.9" hi was .36".
40 meter group after zeroing was .34".
Windage was not affected.
Tools needed;
Ultra fine Sharpie.
Sharp scissors.
Sharp punch.
Drill bit slightly larger than screws.
Screw drivers.
Elevation that was within 2 minutes of top @ ram setting, is now 6.5 minutes from top.
Accuracy seems unchanged.
40 meter point of impact up 1.9".
Lowered elevation adjustment on the Leupold 12X 4.5 minutes (18 clicks) to zero chicken setting @ 40 meters.
40 meter group @ 1.9" hi was .36".
40 meter group after zeroing was .34".
Windage was not affected.
Tools needed;
Ultra fine Sharpie.
Sharp scissors.
Sharp punch.
Drill bit slightly larger than screws.
Screw drivers.
Elevation that was within 2 minutes of top @ ram setting, is now 6.5 minutes from top.
Accuracy seems unchanged.